Violation Detail
Standard Cited: 19260651 H02 Specific Excavation Requirements.
Inspection Nr: 1113629.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 03/02/2016 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/23/2016
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0213100
Contest Date:
Final Order: 04/25/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/25/2016 | $0.00 | 03/02/2016 | Serious | |
Penalty | Z: Issued | 02/23/2016 | $0.00 | 03/02/2016 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.651(h)(2): Where water was controlled or prevented from accumulating by use of water removal equipment, the water removal equipment and operations were not monitored by a competent person to ensure proper operation: a) Lot 148 - On or about December 21, 2015 and at times prior thereto, employees were working in an unprotected trench between 6' and 8' in depth in order to repair a broken water line. A water pump was being used, but it was not adequate enough nor being monitored by a competent person and water continued to accumulate.