Violation Detail
Standard Cited: 19260451 G01 General requirements.
Inspection Nr: 1091890.015
Citation: 01001B
Citation Type: Willful
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/28/2015
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 11/17/2015
Gravity: 10
Report ID: 0316700
Contest Date: 11/16/2015
Final Order: 03/22/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/22/2017 | $0.00 | 11/17/2015 | Willful | |
Penalty | C: Contested | 11/17/2015 | $0.00 | 11/17/2015 | Willful | |
Penalty | Z: Issued | 10/28/2015 | $0.00 | 11/17/2015 | Willful |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section: a) 7 Meadow Ridge Road, Temple, PA; An employee was cutting plywood located on a scaffold platform attached to Pettibone Model Number 8044 elevated 10 feet 8 inch above the ground without the use of fall protection, on or about 06/03/2015. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.