Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1071653.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Quick Fix
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/10/2015
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 5
Report ID: 0523400
Contest Date:
Final Order: 10/09/2015
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/09/2015 | $0.00 | Serious | ||
| Penalty | Z: Issued | 09/10/2015 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: (a) An exit door, located on the north wall near the western side of the building, was locked and secured with cable that prevented immediate use of the door.
Translate