Violation Detail
Standard Cited: 19100147 D06 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1052844.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $0.00
Issuance Date: 04/27/2015
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/16/2015
Gravity: 10
Report ID: 0111400
Contest Date:
Final Order: 05/08/2015
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/08/2015 | $0.00 | 06/16/2015 | Serious | |
| Penalty | Z: Issued | 04/27/2015 | $7,000.00 | 06/16/2015 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(d)(6): Prior to starting work on machines or equipment that had been locked out or tagged out, the authorized employee did not verify that isolation and deenergization of the machine or equipment had been accomplished: Blower Shed and Suite 3: The mechanic did not verify that the blower motor for classifier 2 would not run if the blower motor start button was pressed.