Violation Detail
Standard Cited: 19100333 B02 II A Selection and use of work practices
Inspection Nr: 1045587.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 06/01/2015 2
Initial Penalty: $0.00
Current Penalty: $5,250.00
Issuance Date: 04/28/2015
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0521400
Contest Date:
Final Order: 05/19/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/19/2015 | $5,250.00 | 06/01/2015 | Serious | |
Penalty | Z: Issued | 04/28/2015 | $0.00 | 05/22/2015 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.333(b)(2)(ii)(A): Safe procedures for deenergizing circuits and equipment were not determined before circuits and equipment were denergized. On or about March 4, 2015 safe procedures were not determined prior to an employee de-energizing a circuit, and replacing a motor, exposing an employee to the hazards associated with electrical shock/ electrocution while working on a 480 volt circuit. Abatement documentation is required of this item in accordance with the requirements of 29 CFR 1903.19(d).