Violation Detail
Standard Cited: 19100254 D01 Arc welding and cutting.
Inspection Nr: 1025967.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/24/2015
Nr Instances: 1
Nr Exposed: 29
Abatement Date: 08/28/2015
Gravity: 10
Report ID: 0521400
Contest Date:
Final Order: 08/11/2015
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/11/2015 | $0.00 | 08/28/2015 | Serious | |
| Penalty | Z: Issued | 07/24/2015 | $0.00 | 08/28/2015 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.254(d)(1): Workmen assigned to operate or maintain arc welding equipment were not acquainted with the requirements of 29 CFR 1910.254(d) and 29 CFR 1910.252(a), (b), and (c) Fabrication, welding areas: on or about February 2, 2015, employees assigned to operate arc welding equipment to fabricate steel frames and tanks were not properly instructed and qualified in safe operation and use of such equipment as required by 1910.254(d) and were not acquainted with the requirements of 1910.252(a), (b), and (c); including, fire prevention, personnel protection, health protection and ventilation. Employees were exposed to explosion, struck-by and electrical hazards. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).
Translate