Violation Detail
Standard Cited: 19260757 E04 Open web steel joists.
Inspection Nr: 1019072.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/09/2015
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 07/15/2015
Gravity: 5
Report ID: 0111700
Contest Date: 07/30/2015
Final Order: 04/06/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | R: Review Commission | 04/06/2016 | $0.00 | 07/15/2015 | Serious | |
Penalty | C: Contested | 08/06/2015 | $0.00 | 07/15/2015 | Serious | |
Penalty | Z: Issued | 07/09/2015 | $0.00 | 07/15/2015 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.757(e)(4): Bundles of decking were placed on steel joists prior to all bridging being installed and anchored and all joist bearing ends attached. (a) 2nd Floor, Line 4/5, C/D - Bundles of decking were placed on bar joist prior to them being bridged and anchored. (b) 2nd Floor, Line 6/7, C/D - Bundles of decking were placed on bar joist prior to them being bridged and anchored. (c) Roof, Line 1/2, B/C - Bundles of decking were placed on bar joist prior to them being bridged and anchored. (d) Roof, Line 2/3, B/C - Bundles of decking were placed on bar joist prior to them being bridged and anchored. (e) Roof, Line 4/5, C/D - Bundles of decking were placed on bar joist prior to them being bridged and anchored. (f) Roof, Line 6/7, C/D - Bundles of decking were placed on bar joist prior to them being bridged and anchored. (g) Roof, Line 4/5, E/G - Bundles of decking were placed on bar joist prior to them being bridged and anchored. (h) Roof, Line 5/6, E/G - Bundles of decking were placed on bar joist prior to them being bridged and anchored. (i) Roof, Line 6/7, E/G - Bundles of decking were placed on bar joist prior to them being bridged and anchored.