Violation Detail
Standard Cited: 19100146 D05 II Permit-required confined spaces
Inspection Nr: 1006982.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/06/2015
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 03/18/2015
Gravity: 10
Report ID: 0418200
Contest Date:
Final Order: 03/26/2015
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/26/2015 | $0.00 | 03/18/2015 | Serious | |
| Penalty | Z: Issued | 03/06/2015 | $0.00 | 03/18/2015 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.146(d)(5)(ii): Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not evaluate permit space conditions when entry operations were conducted by testing or monitoring the permit space as necessary: a) Viatera Plant: The employer did not perform atmospheric testing and monitoring to evaluate that entry conditions were acceptable prior to and during employee entry into a daily resin tank (permit-required confined space) in order to perform cleaning tasks.