Violation Detail
Standard Cited: 19100269 C04 II A Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1006073.015
Citation: 01001B
Citation Type: Serious
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/13/2015
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 05/07/2015
Gravity: 10
Report ID: 0316400
Contest Date: 05/06/2015
Final Order: 06/23/2017
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 06/23/2017 | $0.00 | 05/07/2015 | Serious | |
| Penalty | C: Contested | 05/12/2015 | $0.00 | 05/07/2015 | Serious | |
| Penalty | Z: Issued | 04/13/2015 | $0.00 | 05/07/2015 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.269(c)(4)(ii)(A): A more extensive briefing was not conducted when the work was complicated or particularly hazardous: a.) Davis H. Elliot Company, Inc., Goshorn Road, Cameron WV: On or about 11/04/14, during the job briefing, the employer did not address the possibility of the neutral line being strung along the ground making contact with the overhead 7200 volt energized line. ABATEMENT DOCUMENTATION IS REQUIRED.