Violation Detail
Standard Cited: 19260451 F06 General requirements.
Inspection Nr: 990726.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,800.00
Current Penalty: $2,800.00
Issuance Date: 10/01/2014
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 10/21/2014
Gravity: 10
Report ID: 0316100
Contest Date:
Final Order: 11/05/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 10/01/2014 | $2,800.00 | 10/21/2014 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.451(f)(6): The clearance between scaffolds and power lines carrying from 300 volts to 50 kv were less than 10 feet: a) Front of House - On or about 08/08/2014, workers installing stucco from the platforms of a fabricated frame scaffold were exposed to a 4 kv electrical contact hazards for portions of the metal scaffold were located within 4 inches and 11 inches of unshielded over-head power lines. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.