Violation Detail
Standard Cited: 19100269 M02 I Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 963386.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $7,000.00
Current Penalty: $8,820.00
Issuance Date: 09/04/2014
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 10
Report ID: 0419700
Contest Date:
Final Order: 09/25/2014
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/25/2014 | $8,820.00 | Serious | ||
| Penalty | Z: Issued | 09/04/2014 | $7,000.00 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.269(m)(2)(i): The system operator in charge of the lines or equipment and their means of disconnection, did not ensure all of the requirements of paragraph (m)(3) of this section were observed, in the order given: a. On or about March 14, 2014, the system operator did not ensure that all of the requirements of paragraph 29 CFR 1910.269(m)(3) were observed to de-energize a 23kV primary high voltage distribution power line which resulted in an electrical arc flash that injured two contracted employees.