Violation Detail
Standard Cited: 19260451 A01 General requirements.
Inspection Nr: 913428.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 01/03/2014 7
Initial Penalty: $7,000.00
Current Penalty: $4,000.00
Issuance Date: 12/20/2013
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): R
Gravity: 10
Report ID: 0317000
Contest Date: 01/23/2014
Final Order: 02/27/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | R: Review Commission | 02/27/2017 | $4,000.00 | 01/03/2014 | Serious | |
Penalty | C: Contested | 01/23/2014 | $7,000.00 | 01/03/2014 | Serious | |
Penalty | Z: Issued | 12/20/2013 | $7,000.00 | 01/03/2014 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.451(a)(1): Except as provided in paragraphs (a)(2), (a)(3), (a)(4), (a)(5) and (g) of this section, each scaffold and scaffold component shall be capable of supporting, without failure, its own weight and at least 4 times the maximum intended load applied or transmitted to it. a) Roof scaffold, Old Zion Lutheran Church, 628 North Broad Street - A roof bracket scaffold, erected and attached to the building, was loaded with twice the maximum allowable personnel between adjacent roof bracket supports. Two employees performing roofing work were standing on the scaffold between adjacent roof brackets when the scaffold collapsed. Observed on or about 6/21/2013.