Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 907906.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 07/30/2013 2
Initial Penalty: $2,800.00
Current Penalty: $1,400.00
Issuance Date: 07/03/2013
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0729300
Contest Date:
Final Order: 07/25/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/25/2013 | $1,400.00 | 07/30/2013 | Serious | |
Penalty | Z: Issued | 07/03/2013 | $2,800.00 | 07/30/2013 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds were not fully planked or decked between the front uprights and the guardrail supports: JOB SITE: 200 Harding Avenue, Maryland Heights, MO 63043, at this work site, a worker was observed on the lower tier (working level) of a tubular welded scaffold, set atop of the church steeple, approximately 21 feet 3 inches, from peak of the roof to ground level, actively painting the steeple and the working levels of scaffolds were not fully planked or decked between the front uprights and the guardrail supports. The worker was exposed to a fall hazard.