Violation Detail
Standard Cited: 19100147 C06 I C The control of hazardous energy (lockout/tagout).
Inspection Nr: 681938.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 04/11/2013
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 06/28/2013
Gravity: 10
Report ID: 0317900
Contest Date:
Final Order: 05/03/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/03/2013 | $7,000.00 | 06/28/2013 | Serious | |
| Penalty | Z: Issued | 04/11/2013 | $7,000.00 | 05/16/2013 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(6)(i)(C): Where lockout was used for energy control, the periodic inspection did not include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected. a) Area of 949 Evans Street, equipment storage area - employee(s) are authorized to perform maintenance on a John Deere 410D Loader/Backhoe, where energy included gravity and mechanical energy, without receiving periodic inspections of that employees responsibilities under the energy control procedure being inspected. Neither the consultant nor a Plasterer authorized employee conducted a review for each authorized employee, on or about October 12, 2012.