Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 663518.015
Citation: 01001A
Citation Type: Other
Abatement Date: 03/27/2013 2
Initial Penalty: $6,300.00
Current Penalty: $7,000.00
Issuance Date: 03/15/2013
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity:
Report ID: 0215000
Contest Date: 04/24/2013
Final Order: 03/10/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/10/2014 | $7,000.00 | 03/27/2013 | Other | |
Penalty | C: Contested | 04/29/2013 | $6,300.00 | 03/27/2013 | Serious | |
Penalty | Z: Issued | 03/15/2013 | $6,300.00 | 03/27/2013 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii). Location: 42 West Street, Brooklyn, NY. 5th level roof elevator shaft. a) Employees were working approximately 24 feet high on the tubular welded frame scaffold that was not fully planked on or about 09/18/2012. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY of 1,000.00, IN ACCORDANCE WITH 29 CFR 1903.19.