Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 561298.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,080.00
Current Penalty: $500.00
Issuance Date: 10/02/2012
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 11/01/2012
Gravity: 10
Report ID: 0522000
Contest Date: 10/26/2012
Final Order: 03/15/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 03/15/2013 | $500.00 | 11/01/2012 | Serious | |
| Penalty | C: Contested | 10/29/2012 | $3,080.00 | 11/01/2012 | Serious | |
| Penalty | Z: Issued | 10/02/2012 | $3,080.00 | 11/01/2012 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D)(h): (a) On or about May 8, 2012, the machine specific lockout procedures for the presses were not complete and did not address all energy sources such as, but not limited to, a raised ram and a moving, coasting flywheel.
Translate