Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 313429995
Citation: 01001A
Citation Type: Serious
Abatement Date: 03/10/2011 I
Initial Penalty: $3,500.00
Current Penalty: $2,450.00
Issuance Date: 03/07/2011
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 05
Report ID: 0215600
Contest Date:
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/15/2011 | $2,450.00 | 03/10/2011 | Serious | |
Penalty | Z: Issued | 03/07/2011 | $3,500.00 | 03/10/2011 | Serious |