Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 312374556
Citation: 01001A
Citation Type: Serious
Abatement Status: X
Initial Penalty: $750.00
Current Penalty: $450.00
Issuance Date: 03/18/2010
Nr Instances: 1
Nr Exposed: 19
Abatement Date: 03/26/2010
Gravity: 03
Report ID: 0215800
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/01/2010 | $450.00 | 03/26/2010 | Serious | |
| Penalty | Z: Issued | 03/18/2010 | $750.00 | 03/26/2010 | Serious |
Translate