Violation Detail
Standard Cited: 1550035003 Construction Site Power and Hand Tool Rules
Inspection Nr: 312159114
Citation: 01001A
Citation Type: Repeat
Abatement Status: X
Initial Penalty: $6,000.00
Current Penalty: $6,000.00
Issuance Date: 08/15/2008
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 06/18/2008
Gravity:
Report ID: 1055350
Contest Date: 08/15/2008
Final Order: 05/07/2009
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 05/07/2009 | $6,000.00 | 06/18/2008 | Repeat | |
| Penalty | Z: Issued | 08/15/2008 | $6,000.00 | 06/18/2008 | Repeat |
Translate