Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 311136675
Citation: 01001A
Citation Type: Serious
Abatement Date: 06/12/2009 I
Initial Penalty: $750.00
Current Penalty: $488.00
Issuance Date: 06/09/2009
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC): C
Gravity: 03
Report ID: 0214700
Contest Date:
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/02/2009 | $488.00 | 06/12/2009 | Serious | |
Penalty | Z: Issued | 06/09/2009 | $750.00 | 06/12/2009 | Serious |