Violation Detail
Standard Cited: 19100036 D03 Design and construction requirements for exit routes.
Inspection Nr: 309564342
Citation: 01001A
Citation Type: Serious
Abatement Status: X
Initial Penalty: $500.00
Current Penalty: $250.00
Issuance Date: 07/11/2006
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 08/04/2006
Gravity: 02
Report ID: 0111400
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/02/2006 | $250.00 | 08/04/2006 | Serious | |
| Penalty | Z: Issued | 07/11/2006 | $500.00 | 08/04/2006 | Serious |
Translate