Violation Detail
Standard Cited: 19100036 A02 Design and construction requirements for exit routes.
Inspection Nr: 309561421
Citation: 01001A
Citation Type: Serious
Abatement Date: 03/16/2006 X
Initial Penalty: $1,875.00
Current Penalty: $1,125.00
Issuance Date: 03/02/2006
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC): R
Gravity:
Report ID: 0355124
Contest Date:
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/08/2006 | $1,125.00 | 03/16/2006 | Serious | |
Penalty | Z: Issued | 03/02/2006 | $1,875.00 | 03/16/2006 | Serious |