Violation Detail
Standard Cited: 19100036 G02 Design and construction requirements for exit routes.
Inspection Nr: 308763580
Citation: 01001A
Citation Type: Serious
Abatement Status: X
Initial Penalty: $2,250.00
Current Penalty: $1,687.50
Issuance Date: 05/27/2005
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 06/04/2005
Gravity: 03
Report ID: 0420600
Contest Date:
Final Order:
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/14/2005 | $1,687.50 | 06/04/2005 | Serious | |
| Penalty | Z: Issued | 05/27/2005 | $2,250.00 | 06/04/2005 | Serious |
Translate