Violation Detail
Standard Cited: 19100036 D02 Design and construction requirements for exit routes.
Inspection Nr: 307609958
Citation: 01001A
Citation Type: Serious
Abatement Status: I
Initial Penalty: $1,500.00
Current Penalty: $1,000.00
Issuance Date: 09/19/2007
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 09/24/2007
Gravity: 10
Report ID: 0215600
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/12/2007 | $1,000.00 | 09/24/2007 | Serious | |
| Penalty | Z: Issued | 09/19/2007 | $1,500.00 | 09/24/2007 | Serious |
Translate