Violation Detail
Standard Cited: 19260651 I03 Specific Excavation Requirements.
Inspection Nr: 305708380
Citation: 01001A
Citation Type: Unclass
Abatement Status: X
Initial Penalty: $6,300.00
Current Penalty: $3,150.00
Issuance Date: 04/18/2003
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 04/23/2003
Gravity: 10
Report ID: 0316100
Contest Date: 05/12/2003
Final Order: 07/02/2004
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 07/02/2004 | $3,150.00 | 04/23/2003 | Unclass | |
| Penalty | Z: Issued | 04/18/2003 | $6,300.00 | 04/23/2003 | Serious |
Translate