Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 302809355
Citation: 01001A
Citation Type: Serious
Abatement Status: X
Initial Penalty: $450.00
Current Penalty: $450.00
Issuance Date: 04/03/2001
Nr Instances: 2
Nr Exposed: 4
Abatement Date: 04/20/2001
Gravity: 01
Report ID: 0216000
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Translate