Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 300598844
Citation: 01001A
Citation Type: Serious
Abatement Date: 10/16/1998 I
Initial Penalty: $3,500.00
Current Penalty: $1,700.00
Issuance Date: 10/13/1998
Nr Instances: 3
Nr Exposed: 83
Related Event Code (REC):
Gravity: 10
Report ID: 0215600
Contest Date:
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/03/1998 | $1,700.00 | 10/16/1998 | Serious | |
Penalty | Z: Issued | 10/13/1998 | $3,500.00 | 10/16/1998 | Serious |