Violation Detail
Standard Cited: 19100269 D06 III Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 283862.015
Citation: 01001A
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 07/23/2012
Nr Instances: 1
Nr Exposed: 20
Abatement Date: 08/13/2012
Gravity:
Report ID: 0830600
Contest Date:
Final Order: 08/10/2012
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/10/2012 | $7,000.00 | 08/13/2012 | Other | |
| Penalty | Z: Issued | 07/23/2012 | $7,000.00 | 08/13/2012 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.269(d)(6)(iii): All energy isolating devices that were needed to control the energy to the machine or equipment were not physically located and operated in such a manner as to isolate the machine or equipment from the energy source(s): a) On or about March 29, 2012, and at times prior, employees were exposed to a release of hazardous energy from failing to isolate all energy sources prior to starting work associated with the Air Handler Demolition project at the Pueblo Comanche Power Station.This resulted in a contract employee receiving 3rd degree burns when hot water/steam was released during a line breaking job.
Translate