Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 242547.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $2,550.00
Current Penalty: $1,250.00
Issuance Date: 05/07/2012
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 5
Report ID: 0215600
Contest Date: 05/22/2012
Final Order: 10/26/2012
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 10/26/2012 | $1,250.00 | Serious | ||
| Penalty | C: Contested | 06/04/2012 | $2,550.00 | Serious | ||
| Penalty | Z: Issued | 05/07/2012 | $2,550.00 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a) On or about February 8, 2012Job site at 184-44 Midland Parkway Jamaica Estates, NY 11432 Tubular welded frame scaffold was missing a 9 inch wide plank. WRITTEN ABATEMENT CERTIFICATION IS NOT REQUIRED.