Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1826152.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,045.00
Current Penalty: $5,426.50
Issuance Date: 06/11/2025
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 07/30/2025
Gravity: 5
Report ID: 0111100
Contest Date:
Final Order: 06/27/2025
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/27/2025 | $5,426.50 | 07/30/2025 | Serious | |
| Penalty | Z: Issued | 06/11/2025 | $9,045.00 | 07/30/2025 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct an annual or more frequent inspection of the energy control procedure to ensure that the procedure and requirements of this standard were followed: Planer Building - Employer did not conduct an annual inspection of the energy control procedure for Planer #3, to ensure complete energy isolation during maintenance activities.