Violation Detail
Standard Cited: 19260754 E02 II Structural steel assembly.
Inspection Nr: 1811258.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $14,895.00
Current Penalty: $14,895.00
Issuance Date: 09/15/2025
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 10/09/2025
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 11/21/2025
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/21/2025 | $14,895.00 | 10/09/2025 | Serious | |
| Penalty | Z: Issued | 09/15/2025 | $14,895.00 | 10/09/2025 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.754(e)(2)(ii): The employer did not deck over roof and floor holes and openings: (a) On or about March 17, 2025, on the metal roof of a commercial building under construction, an opening was not decked over after three of four sides were cut by employees.
Translate