Violation Detail
Standard Cited: 19260251 A01 Rigging equipment for material handling.
Inspection Nr: 1793989.015
Citation: 01001A
Citation Type: Serious
Abatement Status:
Initial Penalty: $16,550.00
Current Penalty: $16,550.00
Issuance Date: 06/17/2025
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 06/25/2025
Gravity: 10
Report ID: 0626700
Contest Date: 06/24/2025
Final Order:
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 09/04/2025 | $16,550.00 | 06/25/2025 | Serious | |
Penalty | Z: Issued | 06/17/2025 | $16,550.00 | 06/25/2025 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.251(a)(1): Rigging equipment for material handling was not inspected prior to use on each shift and as necessary during its use to ensure that it was safe and defective rigging equipment was not removed from service: On or about December 17, 2024, at the bridge, employees utilized damaged rigging equipment to lift girders for a bridge support without inspecting the equipment prior to use.