Standard Cited: 19100147 D03 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1785716.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $16,550.00
Current Penalty: $14,000.00
Issuance Date: 02/13/2025
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 02/26/2025
Gravity: 10
Report ID: 0317700
Contest Date:
Final Order: 03/10/2025
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/10/2025 | $14,000.00 | 02/26/2025 | Serious | |
Penalty | Z: Issued | 02/13/2025 | $16,550.00 | 02/26/2025 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(d)(3): All energy isolating devices that were needed to control the energy to the machine or equipment were not physically located and operated in such a manner as to isolate the machine or equipment from the energy source(s): a) River Well Motor Control Center: On or about October 29, 2024, an employee was exposed to shock hazards while working inside a motor switch control panel due to not all energy control devices being used to isolate power from the switch panel. Abatement documentation and certification are required.