Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1774260.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 12/30/2024 2
Initial Penalty: $16,131.00
Current Penalty: $9,500.00
Issuance Date: 11/25/2024
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): R
Gravity: 10
Report ID: 0134000
Contest Date:
Final Order: 12/20/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/20/2024 | $9,500.00 | 12/30/2024 | Serious | |
Penalty | Z: Issued | 11/25/2024 | $16,131.00 | 12/30/2024 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(ii): The energy control procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, including, but not limited to the items of this section: Location - #1 Deflation Fan On or about 9/3/2024, the lockout/tagout procedures for the #1 deflation fan did not include the procedures to lock out and tag out the baghouse dampers connected to the #1 deflation fan.