Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1767969.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 03/04/2025 2
Initial Penalty: $16,550.00
Current Penalty: $16,550.00
Issuance Date: 02/03/2025
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity: 10
Report ID: 0830600
Contest Date:
Final Order: 02/27/2025
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 02/03/2025 | $16,550.00 | 03/04/2025 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: (a) Rail Mill, North stamp wheel: On or about August 9, 2024, and at times prior, the employer did not ensure that employees engaged in maintenance activities utilized energy control procedures to isolate and de-energize the sled while the face plate was removed to replace a retaining pin on the north stamp wheel. This condition exposed employees to caught-between and crushed-by hazards resulting in a fatality.