Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1760523.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $11,292.00
Current Penalty: $6,775.20
Issuance Date: 10/22/2024
Nr Instances: 1
Nr Exposed: 4
Abatement Date:
Gravity: 10
Report ID: 0522500
Contest Date:
Final Order: 11/19/2024
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/19/2024 | $6,775.20 | Serious | ||
Penalty | Z: Issued | 10/22/2024 | $11,292.00 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(6)(i):The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. a. On or about July 15, 2024, the employer failed to conduct a periodic inspection in order to identify inadequacies and correct any deviations for the energy control procedure for the Winkler & Dunnebier envelope machine, Type 102, serial No. 10138.