Violation Detail
Standard Cited: 19261413 A01
Inspection Nr: 1756377.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $4,839.00
Current Penalty: $500.00
Issuance Date: 11/22/2024
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 10
Report ID: 0112300
Contest Date:
Final Order: 12/20/2024
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/20/2024 | $500.00 | Serious | ||
Penalty | Z: Issued | 11/22/2024 | $4,839.00 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.1413(a)(1): A competent person did not begin a visual inspection prior to each shift the equipment is used and/or did not complete the visual inspection before or during that shift. a) Jobsite: On or about 6/20/24, the employer did not ensure a competent person conducted a visual inspection of the equipment to include the wire rope on the American Crane prior to the work shift beginning or during that shift.