Violation Detail
Standard Cited: 19100147 C01 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1754792.015
Citation: 01001A
Citation Type: Repeat
Abatement Status: Abatement Completed
Initial Penalty: $15,000.00
Current Penalty: $15,000.00
Issuance Date: 07/24/2024
Nr Instances: 1
Nr Exposed: 20
Abatement Date: 07/24/2024
Gravity: 10
Report ID: 0522000
Contest Date:
Final Order: 07/24/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/24/2024 | $15,000.00 | 07/24/2024 | Repeat | |
Penalty | Z: Issued | 07/24/2024 | $15,000.00 | 08/19/2024 | Repeat |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(1): Energy control program. The employer shall establish a program consisting of energy control procedures, employee training and periodic inspections to ensure that before any employee performs any servicing or maintenance on a machine or equipment where the unexpected energizing, startup or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source and rendered inoperative. a) On or about June 10, 2022, the employer did not have an energy control program that included specific energy isolation procedures, training for authorized, affected, and other employees, and periodic inspections of the procedures on an annual basis for equipment such as but not limited to; Colborne Pie Crust Machine.