Violation Detail
Standard Cited: 19100147 C06 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1733707.015
Citation: 01001A
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $13,828.00
Current Penalty: $27,656.00
Issuance Date: 06/25/2024
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 08/30/2024
Gravity: 5
Report ID: 0627510
Contest Date:
Final Order: 07/29/2024
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/29/2024 | $27,656.00 | 08/30/2024 | Other | |
| Penalty | Z: Issued | 06/25/2024 | $13,828.00 | 07/17/2024 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(6)(ii): The employer did not certify that periodic inspections of the energy control procedures had been performed: On or about the 4th of March 2024, at Roscoe Wind Turbine 169, the employer failed to certify periodic inspections of employees performing servicing and maintenance activities on wind towers including, but not limited to, capacitor(s) which had stored electric as its energy source.