Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1717457.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,292.00
Current Penalty: $4,033.00
Issuance Date: 03/13/2024
Nr Instances: 1
Nr Exposed: 20
Abatement Date: 03/19/2024
Gravity: 10
Report ID: 0111700
Contest Date:
Final Order: 03/21/2024
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/21/2024 | $4,033.00 | 03/19/2024 | Serious | |
Penalty | Z: Issued | 03/13/2024 | $11,292.00 | 03/19/2024 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.36(d)(1):Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: On or about December 19, 2023 at Recycling Associates Inc in Nashua NH. An emergency exit at the rear of the building was not able to be opened.