Violation Detail
Standard Cited: 19260451 B01 II General requirements.
Inspection Nr: 1717155.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $6,453.00
Current Penalty: $3,549.15
Issuance Date: 05/23/2024
Nr Instances: 1
Nr Exposed: 5
Abatement Date:
Gravity: 5
Report ID: 0215300
Contest Date:
Final Order: 06/14/2024
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/14/2024 | $3,549.15 | Serious | ||
| Penalty | Z: Issued | 05/23/2024 | $6,453.00 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.451(b)(1)(ii): The platform was not planked or decked as fully as possible and the remaining open space between the platform and the uprights exceeded 9.5 inches (24.1 cm): a) On or about Dec 13, 2023, University of the Virgin Islands - Medical School, St Thomas, VI 00802. - Exterior-facing University Library - Working levels of the tubular welded frame scaffolding system are not fully planked, exposing employees to a fall from a scaffold. NOTE: Certification of abatement is not required for this citation item, as abatement was documented by the compliance safety and health officer during the inspection.