Violation Detail
Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.
Inspection Nr: 1715528.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,218.00
Current Penalty: $9,218.00
Issuance Date: 05/30/2024
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 08/08/2024
Gravity: 5
Report ID: 0134000
Contest Date:
Final Order: 06/21/2024
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/21/2024 | $9,218.00 | 08/08/2024 | Serious | |
Penalty | Z: Issued | 05/30/2024 | $9,218.00 | 08/08/2024 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.107(b)(5)(i): The spraying operations (except electrostatic spraying operations) were not designed, installed and maintained such that the average air velocity over the open face of the booth (or booth cross section during spraying operations) was not less than 100 linear feet per minute. Electrostatic spraying was conducted when the air velocity over the open face of the booth was less than 60 linear feet per minute (or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics). Visible gauges or audible alarm or pressure activated devices were not installed to indicate or ensure that the required air velocity was maintained. Filter rolls were not inspected to insure proper replacement of filter media. Location - Spray booth: On or about 12/8/23, the employer utilized a spray booth that was not properly maintained as the pressure differential gauge was inoperative and air filters were not inspected and replaced as they were observed clogged with a substantial amount of spray finishing materials.