Violation Detail
Standard Cited: 19150089 D01
Inspection Nr: 1711451.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,372.00
Current Penalty: $6,223.00
Issuance Date: 04/05/2024
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 06/14/2024
Gravity: 5
Report ID: 0524530
Contest Date:
Final Order: 05/01/2024
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/01/2024 | $6,223.00 | 06/14/2024 | Serious | |
| Penalty | Z: Issued | 04/05/2024 | $10,372.00 | 05/22/2024 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
1915.89(d)(1): The employer did not establish and implement a written procedure to prevent energization or startup, or the release of hazardous energy, during the servicing of a machine, equipment, or system: On or about November 15, 2023, the employer did not establish and implement a written procedure to prevent energization of a Delco Products Div of General Motors Generator, Model Number E6625HF, Serial Number 16-R-73 during the servicing of the machine by an employee.