Violation Detail

Standard Cited: 19150089 D01  

Inspection Nr: 1711451.015

Citation: 01001A

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $10,372.00

Current Penalty: $6,223.00

Issuance Date: 04/05/2024

Nr Instances: 1

Nr Exposed: 1

Abatement Date: 06/14/2024

Gravity: 5

Report ID: 0524530

Contest Date:

Final Order: 05/01/2024

Related Event Code (REC): R

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 05/01/2024 $6,223.00 06/14/2024 Serious  
Penalty Z: Issued 04/05/2024 $10,372.00 05/22/2024 Serious  

Text For Citation: 01 Item/Group: 001A Hazard:

1915.89(d)(1): The employer did not establish and implement a written procedure to prevent energization or startup, or the release of hazardous energy, during the servicing of a machine, equipment, or system: On or about November 15, 2023, the employer did not establish and implement a written procedure to prevent energization of a Delco Products Div of General Motors Generator, Model Number E6625HF, Serial Number 16-R-73 during the servicing of the machine by an employee.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.