Violation Detail
Standard Cited: 19260503 C03 Training requirements.
Inspection Nr: 1700919.015
Citation: 01001A
Citation Type: Willful
Abatement Status: Abatement Completed
Initial Penalty: $80,662.00
Current Penalty: $84,000.00
Issuance Date: 03/06/2024
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 06/03/2024
Gravity: 10
Report ID: 0316700
Contest Date:
Final Order: 04/01/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/01/2024 | $84,000.00 | 06/03/2024 | Willful | |
Penalty | Z: Issued | 03/06/2024 | $80,662.00 | 03/20/2024 | Willful |
Text For Citation: 01 Item/Group: 001A Hazard:
1926.503(c)(3) The employer did not retrain affected employees who already had been trained but demonstrated inadequate understanding and skill required by paragraph (a) of this section: a. Roof - On or about October 2, 2023, employees were performing roofing work while wearing harnesses, but were not tied off at a height of approximately 28 feet above grade on an steeply pitched commercial roof. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.