Standard Cited: 19260251 A01 Rigging equipment for material handling.

Inspection Nr: 1674912.015

Citation: 01001A

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $15,625.00

Current Penalty: $12,500.00

Issuance Date: 11/20/2023

Nr Instances: 2

Nr Exposed: 4

Abatement Date: 12/19/2023

Gravity: 10

Report ID: 0636900

Contest Date:

Final Order: 12/13/2023

Related Event Code (REC): A;R

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 12/13/2023 $12,500.00 12/19/2023 Serious  
Penalty Z: Issued 11/20/2023 $15,625.00 12/19/2023 Serious  

Text For Citation: 01 Item/Group: 001A Hazard:

29 CFR 1926.251(a)(1): Rigging equipment for material handling was not inspected prior to use on each shift and as necessary during its use to ensure that it was safe: On or about June 5, 2023, and at times prior thereto, at the utility construction jobsite, the employer did not adequately ensure that rigging equipment such as but not limited to alloy steel chain slings were inspected prior to use or each shift, potentially exposing employees to crush-by and/or struck-by hazards.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.