Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1658790.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $15,625.00
Current Penalty: $11,718.75
Issuance Date: 09/12/2023
Nr Instances: 2
Nr Exposed: 17
Abatement Date: 09/22/2023
Gravity: 10
Report ID: 0522500
Contest Date:
Final Order: 09/27/2023
Related Event Code (REC): A;C;R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/27/2023 | $11,718.75 | 09/22/2023 | Serious | |
Penalty | Z: Issued | 09/12/2023 | $15,625.00 | 09/22/2023 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section. a. On the East Rough Slitter, or on about June 13, 2023, and at times prior, employees did not utilize the documented energy control procedure in place while performing maintenance and servicing covered activities such as, but not limited to, inspection/ troubleshooting of the scrap chopper, knives changes, machine adjustments and machine setup. As a result, employees were exposed to caught-in/between and struck-against/struck-by hazards. b. On the North Line East PG, on or about March 15, 2023, employees did not utilize the documented energy control procedure in place while performing maintenance and servicing covered activities such as, but not limited to, performing repairs to the actuator of the PG East vertical hydraulic cylinder. As a result, employees were exposed to caught-in/between and struck-by hazards.