Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1655323.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $8,929.00
Current Penalty: $5,357.40
Issuance Date: 04/26/2023
Nr Instances: 2
Nr Exposed: 1
Abatement Date:
Gravity: 5
Report ID: 0522300
Contest Date:
Final Order: 05/19/2023
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/19/2023 | $5,357.40 | Serious | ||
| Penalty | Z: Issued | 04/26/2023 | $8,929.00 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D): a. On or about March 6, 2023, the employer did not ensure an employee performing service and maintenance activities on the DMG Mori CNC Multi-Spindle Lathe Machine, known as the Swiss 2 Machine, utilized energy control procedures to control the potentially hazardous electrical and pneumatic (air) energy sources while cleaning the Swiss 2 Machine. b. On or about March 7, 2023, the employer did not ensure an employee performing service and maintenance activities on the DMG Mori CNC Multi-Spindle Lathe Machine, also known as the Swiss 2 Machine, utilized energy control procedures to control the potentially hazardous electrical and pneumatic (air) energy sources while setting up the Swiss 2 Machine.