Violation Detail
Standard Cited: 19260451 F06 General requirements.
Inspection Nr: 1651743.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $6,250.00
Current Penalty: $6,250.00
Issuance Date: 05/10/2023
Nr Instances: 1
Nr Exposed: 6
Abatement Date:
Gravity: 10
Report ID: 0134000
Contest Date: 09/29/2023
Final Order: 03/04/2024
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/04/2024 | $6,250.00 | Serious | ||
Penalty | C: Contested | 01/17/2024 | $6,250.00 | Serious | ||
Penalty | Z: Issued | 05/10/2023 | $6,250.00 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.451(f)(6): Scaffolds were erected, used, dismantled, altered, or moved such that they or any conductive material handled on them might come closer than 10-feet to exposed and energized power lines. Location: 208 Highland Ave, Malden, MA; On or about 02/21/2023, the employer erected and allowed employees to utilize an Alum-A-Pole pumpjack scaffolding system which was within 3-feet of energized main power lines.