Violation Detail
Standard Cited: 19100269 L01 III Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1645712.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $15,625.00
Current Penalty: $15,625.00
Issuance Date: 07/14/2023
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): I
Gravity: 10
Report ID: 0213400
Contest Date: 08/07/2023
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 08/11/2023 | $15,625.00 | Serious | ||
Penalty | Z: Issued | 07/14/2023 | $15,625.00 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.269(l)(1)(iii): Electric lines and equipment shall be considered and treated as energized unless they have been deenergized in accordance with paragraph (d) or (m) of this section. A) Consolidated Edison Co. - Holsman Rd. and Campus Rd., Staten Island NY 10301 - The employer did not ensure the electrical lines and equipment were considered and treated as energized while employees were moving 4KV cables to new utility poles. Employees were exposed to the hazard of electrical shock and burns. Condition occurred on January 18, 2023.