Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1642597.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,938.00
Current Penalty: $10,938.00
Issuance Date: 06/13/2023
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 10/02/2023
Gravity: 10
Report ID: 0111700
Contest Date:
Final Order: 07/14/2023
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/14/2023 | $10,938.00 | 10/02/2023 | Serious | |
Penalty | Z: Issued | 06/13/2023 | $10,938.00 | 06/26/2023 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: Location: Stacker Building On or about January 10, 2023, Precision Lumber Inc Wentworth NH - Procedures for the stacker jams were not developed, documented or utilized to control potential energy.